Have your say on draft Development Plans

Cross Yarra Partnership (CYP) is the consortium contracted to design, build and maintain the stations and tunnels for the Metro Tunnel Project.

CYP has prepared draft Development Plans for the built form at each of the tunnel entrances; the Western Portal in Kensington and Eastern Portal in South Yarra. These development plans include site layout plans, architectural, and landscape and public realm plans,

The plans can be viewed on the Metro Tunnel website.

Feedback is invited on the Plans from Friday 6 April 2018 until 5pm Friday 27 April 2018.

These plans demonstrate how the works will be delivered in accordance with the approved Environmental Performance Requirements as defined in the Metro Tunnel Environmental Management Framework, and the approved Urban Design Strategy. The Minister for Planning must approve the Development Plan prior to the commencement of works covered in the Plan.

Please note:

  • The draft Development Plans only address the scope and extent of CYP’s works at the Eastern Portal and Western Portal. Other works proposed in the Eastern Portal and Western Portal, including landscaping and hardscaping in the public realm, will be undertaken by the appointed Rail Infrastructure Alliance (RIA) contractor.
  • The scope and extent of the built form for the appointed RIA contractor will be addressed in separate Development Plans, which will be subject to public inspection and comment in accordance with the Incorporated Document.


Scope of feedback

Anyone may provide feedback on the draft Development Plans during the public display and comment period. 

Please note, comments that relate to activities which are not part of the draft Development Plan scope will not be considered as part of the draft Development Plan comment process.

You can use the Save button at the top of the screen to return at a later stage to complete your feedback.
 
Further assistance 

If you require assistance with completing this form or require the form in an alternative format, please phone the Metro Tunnel Project Information Line on 1800 105 105 or the Interpreter Line on (03) 9280 0700.