ST TDLE - 077-032-002 - Tacoma Dome table survey

Please select which projects below you'd like to comment on.

Project Name

Project Type

Project Description

1.

project name: TD 1: East D Street and East Dock Street intersection

project type: pedestrian iconbike icon

project description: Make improvements at the intersection of East D Street and E Dock Street, including:

  • sidewalks
  • south leg crosswalk
  • bicycle transition to sidewalk and bicycle box at intersection
  • safety improvements through intersection
2.

project name: TD 2/ PA 11: Puyallup Avenue improvements

project type: pedestrian iconbike icon

project description: Make improvements to Puyallup Avenue/S 24th Street between South C Street and Portland Avenue, including:

  • upgrade sidewalks
  • improve all signalized crossings with ADA improvements, crosswalks, and signal enhancements
  • add crossings (midblock or at intersections), as needed
  • add bicycle facilities
  • add bicycle/pedestrian connection to the Water Flume Line Trail (and future Prairie Line Trail extension) on S Holgate Street between S 24th Street and S 25th Street
3.

project name: TD 3: Dome District railroad crossing improvements

td8.jpg

project type: pedestrian iconbike icon

project description: Improve bicycle and pedestrian safety at railroad crossings in the Dome District, including crossings between 25th and 26th Streets on East D St and East C St

4.

project name: TD 4: Prairie Line Trail final phase

td9.jpg

project type: pedestrian iconbike icon

project description: Construct the final phase of the Prairie Line Trail from S 21st Street to S 25th Street

5.

project name: TD 5: E 26th Street and I-5 off-ramp intersection

project type: pedestrian icon

project description: Make improvements at the intersection of the I-5 off-ramp and E 26th Street, including improving the crosswalk

6.

project name: TD 6: E 25th Street overcrossing

project type: pedestrian icon

project description: Construct grade-separated pedestrian connection between the station platform and parking garage over E 25th Street

7.

project name: TD 7: E 25th Street sidewalks

project type: pedestrian icon

project description: Complete gaps in sidewalk and improve pedestrian safety and accessibility on E 25th Street (both sides) from South C Street to East J Street

8.

project name: TD 8: E 26th Street sidewalks

project type: pedestrian icon

project description: Complete gaps in sidewalk on E 26th Street (both sides) from A Street to East F Street

 To ensure we receive your comments, don't forget to click "Submit" at the bottom of this survey!

9.

project name: TD 9: East D Street bike lanes

td6.jpg

project type: bike icon

project description: Improve bicycle lanes on East D Street/East McKinley Way from E 21st Street to Wright Avenue by providing separation from travel lanes and safety improvements through intersections